top of page

Mapleton Hall Timeline c.21 1

2001

  • New windows installed throughout the main floor.

2006

  • New porch stairways and railings installed.

  • Kitchen remodeled.

2007

  • Exterior repaired and painted.

2008

  • New windows installed on lower floor and the attic.

  • Main floor tin ceilings refurbished and painted.

2009

  • New audience platforms built.

  • Interior walls restored with period-appropriate paint.

  • New Mapleton Hall/Suffield Players sign installed over entrance.

bottom of page